Thursday, September 16, 2010

On Location Tour Continues

Gar took the first stint behind the wheel and just kept going, he drove for 8 hours and 450 miles. He jumped out of the drivers seat at 4.00am and it was now my turn to take over, there was a significant drop in air temperature amongst very heavy wind and rain. After about an hour the rain and wind eased and it turned out to be a pretty nice morning as we rolled in to Tennessee, we arrived at the MasterCraft Boat Company at 11.15am Central time. Aarne Clow was there to meet us.


Aarne, our MasterCraft team manager was there to meet with us as we rolled in and ready to take Diego Gar and I to Lunch.




I love coming to the MasterCraft Factory, there is always something to learn.

No comments:

Post a Comment